Water Resources

4

Total Products

Assessment, conservation, and sustainable utilization of water resources, particularly drinking water springs and wastewater. It includes source identification, quality and quantity analysis, and the design of wastewater treatment systems to ensure clean water supply, environmental protection, and public health safety.

Project Name

-

Project Location

Khalanga of Bheri Municipality, Jajarkot, and Khalanga of Saarada Municipality, Salyan district

Total Districts

1

Total Contract Amt.

NPR 948,635.00

Clients

Basin Management Center, Karnali

Start End Dates

Mar 2024 - Jul 2024

Project Description

Activities Completed

Step

1

Hydrogeological and Source Identification

Step

2

Water Quality and Discharge Assessment

Step

3

Mapping and Spring Situation Analysis

Step

4

Wastewater Characterization and Treatment Design

Step

5

System Planning and Infrastructure Integration

The Water Resources project area involves identifying and analyzing water sources like natural springs, rivers, and groundwater to assess their potential for potable use. Special attention is given to the mapping and situation analysis of drinking water springs, including discharge measurements, seasonal variability, recharge conditions, and water quality testing (physical, chemical, and biological parameters). Simultaneously, wastewater treatment plant (WWTP) design and analysis are conducted to manage and recycle wastewater from domestic or industrial sources. This includes feasibility studies, treatment technology selection (e.g., anaerobic, aerobic, MBBR), and environmental compliance. The integrated approach ensures water availability, protects ecosystems, and supports the sustainability of rural and urban water systems. Advanced tools like GIS, hydrological modeling, and lab-based analysis play a critical role in the planning and implementation process.

Projects

Identification, Mapping, and Situation Analysis of Drinking Water Springs of Urban Watershed

  • Project Location: Khalanga of Bheri Municipality, Jajarkot, and Khalanga of Saarada Municipality, Salyan district
  • Total Contract Amount: NPR 948,635.00
  • Mar 2024 - Jul 2024

Identification, Mapping, and Situation Analysis of Drinking Water Springs of Urban Watershed

  • Project Location: Katari Municipality of Udhayapur and Kamalamai Municipality of Sindhuli district
  • Total Contract Amount: NPR 949,765.00
  • Apr 2024 - Jun 2024

Survey and Design of Lift Water and Water Tank Supply Including Motor, Pump and Pipeline

  • Project Location: Gotikhel, Devichaur, Lele and Ghusel
  • Total Contract Amount: NPR 59,890.00
  • Mar 2017 - Jul 2017

Topographic Survey of Five Existing Wastewater Treatment Plant Sites

  • Project Location: Kathmandu Valley
  • Total Contract Amount: NPR 290,014.00
  • Oct 2012 - Jan 2013