Land Use Planning

31

Total Products

Rajdevi's specialized services in land use planning are centered on the principles of sustainable development, aiming to optimize land resources while preserving the environment.

Project Name

-

Project Location

Kathmandu, Bhaktapur, Lalitpur and Nuwakot

Total Districts

4

Total Contract Amt.

NPR 27,170,850.00

Clients

Survey Department

Start End Dates

Jan 2021 - Jul 2021

Project Description

Activities Completed

Step

1

VDC Profiling and Baseline Data Collection

(Gather and analyze data on socio-economy, demography, environment, history, culture, land resources, agriculture, and natural resources to create comprehensive VDC profiles)

Step

2

Soil and Land Capability Mapping

(Prepare detailed soil and land capability maps to assess land quality and determine suitable areas for agriculture, forestry, urban development, and conservation)

Step

3

Current Land Use and Resource Mapping

(Develop present land use maps and identify natural resource zones (forests, rivers, wetlands, etc.) for proper classification and conservation planning.)

Step

4

Land Use Zoning and Sub-Zoning

(Zone land into categories such as agriculture, forest, built-up, industrial, and public service areas. Sub-zone agricultural land based on productivity potential and delineate urban/suburban zones for balanced development.)

Step

5

Cadastral Integration and Database Development

(Superimpose cadastral maps onto land use zoning maps to identify ownership patterns and build a comprehensive spatial database to support planning, implementation, and monitoring.)

Rajdevi's specialized services in land use planning are centered on the principles of sustainable development, aiming to optimize land resources while preserving the environment. We employ a multifaceted approach that involves comprehensive analysis, strategic planning, and the implementation of effective strategies to assist clients in maximizing the utility of land resources.

The foundation of our land use planning services lies in conducting thorough and comprehensive analyses. This includes assessing geographical features, land characteristics, existing land uses, and potential development opportunities. Our experts delve into understanding the ecological significance, soil types, water resources, biodiversity, and any constraints that may impact land utilization. Through this detailed analysis, we acquire a holistic view of the land's potential and limitations. Rajdevi recognizes the critical importance of conducting environmental assessments as part of land use planning. We undertake rigorous assessments to evaluate the potential environmental impacts of proposed land developments. This involves studying the effects on air quality, water resources, wildlife habitats, ecosystems, and overall biodiversity.


Projects

Preparation of 11 Nos. of Soil Map of Sindhupalchowk District through GIS Tools

  • Project Location: Sindhupalchowk district
  • Total Contract Amount: NPR 60,000.00
  • May 2019 - Aug 2019

Preparation of Gaunpalika/Nagarpalika Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, Gaunpalika/Nagarpalika Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 08) of Kathmandu, Bhaktapur, Lalitpur and Nuwakot District.

  • Project Location: Kathmandu, Bhaktapur, Lalitpur and Nuwakot
  • Total Contract Amount: NPR 27,170,850.00
  • Jan 2021 - Jul 2021

Preparation of Gaunpalika/Nagarpalika Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, Gaunpalika/Nagarpalika Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 18) of Bajura District.

  • Project Location: Salyan district
  • Total Contract Amount: NPR 15,983,850.00
  • Jul 2019 - Feb 2020

Soil Fertility Assessment and Mapping of five Super Zone sites of Nepal [Rice (Jhapa), Maize (Dang), Wheat (Kailali) Vegetable (Kaski) and Potato (Kavreplanchowk)]

  • Project Location: Jhapa, Dang, Kailali, Kaski & Kavreplanchowk districts
  • Total Contract Amount: NPR 1,994,499.00
  • May 2018 - Jul 2018

Preparation of VDC Level Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps and Cadastral Layer Superimpose and VDC Profile (Package-III)

  • Project Location: Mangalpur, Phulbari, Sharadanagar, Gitanagar, Shivanagar, Parbatipur, Pathihani VDCs of Chitwan District.
  • Total Contract Amount: NPR 13,209,700.00
  • Apr 2011 - Jun 2011

Preparation of VDC level land resource maps (Present Land Use Map, Soil Map, Land Capability Map, Risk Layer Map, Land Use Zoning Map, Superimpose of Cadastral Layers, VDC Profile), Database and Reports

  • Project Location: Garamani, Haldibari, Dangibari, Goldhap, Raigadh & Chakchaki VDC of Jhapa District
  • Total Contract Amount: NPR 10,011,302.00
  • Dec 2015 - Apr 2016

Preparation of VDC Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package VllI)

  • Project Location: Dhanusha District
  • Total Contract Amount: NPR 14,949,448.00
  • Dec 2016 - May 2017

Preparation of VDC Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package Vll)

  • Project Location: Belawa, Motipur, Deudakala, Dhadhwar, Magargadhi & Sorahawa VDCs of Bardiya District
  • Total Contract Amount: NPR 14,694,226.00
  • Jan 2015 - May 2015

Preparation of VDC Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package VIII)

  • Project Location: Dodohara, Kota Tulsipur, Bauniya, Chuha, Pratappur, Janki Nagar, Durgauli & Pathariya VDCs of Kailali District
  • Total Contract Amount: NPR 15,001,128.00
  • Jan 2014 - May 2014

Preparation of VDC Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 22)

  • Project Location: Morang District
  • Total Contract Amount: NPR 15,948,481.00
  • Dec 2016 - Jun 2017

Preparation of Gaunpalika/Nagarpalika Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, Gaunpalika/Nagarpalika Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 20)

  • Project Location: Nisdi, Purbakhola Gaunpalika of Palpa District
  • Total Contract Amount: NPR 14,889,605.00
  • Dec 2017 - Jun 2018

Preparation of VDC Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 18)

  • Project Location: Saptari District
  • Total Contract Amount: NPR 12,949,122.00
  • Dec 2016 - May 2017

Preparation of Gaunpalika/Nagarpalika Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, Gaunpalika/Nagarpalika Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 18)

  • Project Location: Tribeni Nagarpalika, Badimakila Nagarpalika, Budhiganga Nagarpalika, Chhededaha Gaupalika, Pandab Gupha Gaupalika & Gaumul Gaupalika of Bajura District
  • Total Contract Amount: NPR 1,495,550.00
  • Jul 2019 - Feb 2020

Field Verification and Preparation of cadastral Based inventory of Land Use Classification

  • Project Location: Malakheti, Shreepur and Geta, Kailali District
  • Total Contract Amount: NPR 887,050.00
  • Jun 2014 - Jul 2014

Catalytic Support on Land Issues Outcome to Project Component in Nepal for Preparation and Implementation of Participatory Land Use Planning and Implementation

  • Project Location: Surkhet, Parasi & Morang Districts
  • Total Contract Amount: NPR 16,779,000.00
  • Mar 2014 - Feb 2015

Classification of Land Based on the VDC Level Land Use Zoning Maps

  • Project Location: Argauli, Daunnedevi, Divyapuri, Dumkibas, Kawasoti, Kolhuwa, Kumarwati, Makar, Mukundapur, Narayani, Naya Belhani, Panchanagar, Pithauli; Pragatinagar, Prasauni, Rajahar, Ramnagar, Shivamandir, Timsariya, Tilakpur, Manari & Rupauliya VDCs
  • Total Contract Amount: NPR 6,147,200.00
  • Feb 2015 - Jul 2015

Develop Risk Sensitive Land Use Planning

  • Project Location: Godawari & Lamkichuha Municipalities, Kailai, Nepal
  • Total Contract Amount: NPR 37,643,801.00
  • Feb 2021 - Feb 2022

Preparation of Draft of Land Use Act

  • Project Location: Nepal
  • Total Contract Amount: NPR 994,000.00
  • Apr 2014 - Jun 2014

Preparation of Risk Sensitive Land Use Map of Kamalamai Municipality, Sindhuli

  • Project Location: Kamalamai Municipality, Sindhuli
  • Total Contract Amount: NPR 2,456,620.00
  • Jun 2018 - May 2019

Preparation of Gaunpalika/Nagarpalika Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, Gaunpalika/Nagarpalika Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 12)

  • Project Location: Annapurna Gaunpalika of Kaski District
  • Total Contract Amount: NPR 14,889,605.00
  • Dec 2017 - Jun 2018

Preparation of Gaunpalika/Nagarpalika Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, Gaunpalika/Nagarpalika Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package 10)

  • Project Location: Bangad Nagarpalika, Siddha Kumakh Gaunpalika, Kumakh Gaunpalika and Kalimati Gaunpalika of Salyan District
  • Total Contract Amount: NPR 15,983,850.00
  • Jul 2019 - Feb 2020

Preparation of Urban Land Use Plan of Kamalamai Municipality

  • Project Location: Kamalamai Municipality
  • Total Contract Amount: NPR 859,365.00
  • Aug 2016 - Feb 2017

Preparation of Terms of Reference (ToT), 2068 for Preparation of VDC Level Land Use Resource Maps, Database and Reports

  • Project Location: Nepal
  • Total Contract Amount: NPR 294,000.00
  • Sep 2011 - Oct 2011

Preparation of VDC Level Land Resource (Present Land Use Maps, Soil Maps, Land Capability Maps, Land Use Zoning Maps, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), Database and Reports (Package Vlll)

  • Project Location: Rudrapur, Dudharakshaya, Gajedi, Khadawabangi & Semalar VDCs of Rupandehi District
  • Total Contract Amount: NPR 10,163,220.00
  • Jan 2015 - May 2015

Details Survey of Land Pooling Schemes from Khokana to Harisiddhi (about 10,000 ropani) & 10 KM Road, Kathmandu Valley for Outer Ring Road (6 Lane) Development Project/ DUDBC/ GoN (2009-10) 2. Detail Survey of 12 Bridges at Jhapa & Morang districts for Department of Roads/ GoN (2009-10)

  • Project Location: Jhapa & Morang Districts
  • Total Contract Amount: NPR 780,000.00
  • Jan 2010 - Jul 2010

The Feasibility Study of Land Pooling Project at Purano Bazar ward no. 1 Narayan Municipality Dailekh, Purano Bazar ward no. 1

  • Project Location: Purano Bazar ward no. 1, Narayan Municipality Dailekh, Purano Bazar ward no. 1
  • Total Contract Amount: NPR 684,800.00
  • May 2016 - Nov 2016

Implementation of Land Record Information Management system (LRIMS) Khanda "Ka"

  • Project Location: Taplejung, Ilam, Mangalbare (Ilam), Dhankuta, Sankhuwasabha, Chainpur (Sankhuwasabha), Bhojpur, Terahthum, Okhaldhunga, Khotang, Solukhumbu, Katari(Udaypur), Siraha, Lahan(Siraha) Malpot Offices
  • Total Contract Amount: NPR 8,023,000.00
  • Jan 2018 - Nov 2020

Second Rural Access Programme Topographical and Land Acquisition Cadastral Mapping works for the design review Phase of the Second Rural Access Programme Bridge Component: Design and Construction of the Arun (Leguwaghat) and Sabha Khola Bridges.

  • Project Name: Second Rural Access Programme Topographical and Land Acquisition Cadastral Mapping works for the design review Phase of the Second Rural Access Programme Bridge Component: Design and Construction of the Arun (Leguwaghat) and Sabha Khola Bridges.
  • Project Location: Sankhawasaba District
  • Total Contract Amount: NPR 623,000.00
  • Jul 2010 - Oct 2010

National Level Specification for the Preparation of VDC Level Land Resource Maps, Database and Reports

  • Project Location: Nepal
  • Total Contract Amount: NPR 2,799,575.00
  • Apr 2012 - Jul 2012

Preparation and Implementation of Detailed Project Report of Proposed Land Pooling Project at Salyansthan Area, Kritipur Municipality

  • Project Location: Kritipur Municipality, Kathmandu
  • Total Contract Amount: NPR 2,915,400.00
  • Jul 2019 - Mar 2021

Preparation of Detailed survey of Land Pooling Scheme survey for Preparation of Topographical maps of Balambu-Sitapaila-Goldhunga Land pooling Project (Approx 10000 Ropani) in kathmandu valley for outer Ring Road Development project.

  • Project Location: Balambu-Sitapaila-Goldhunga
  • Total Contract Amount: NPR 3,500,000.00
  • Jul 2009 - Dec 2009