Feasibility Study

20

Total Products

A systematic assessment conducted to evaluate the technical, economic, environmental, legal, and social viability of a proposed project.

Project Name

-

Project Location

Rolpa District

Total Districts

1

Total Contract Amt.

NPR 18,193,571.00

Clients

Department of Electricity Development (DoED) Government of Nepal

Start End Dates

May 2015 - Sep 2019

Project Description

Activities Completed

Step

1

Project Scoping and Objective Definition

(Identify stakeholders, target areas, and expected outputs)

Step

2

Data Collection and Baseline Assessment

(Gather primary and secondary data (technical, environmental, social, economic, legal))

Step

3

Technical Feasibility Analysis

(Evaluate design alternatives, engineering parameters, technology options, and implementation strategies)

Step

4

Environmental and Social Impact Assessment (Preliminary)

(Propose initial mitigation measures or alternatives)

Step

5

Financial and Economic Analysis

(Explore funding options, return on investment, and affordability)

Step

6

Legal, Institutional, and Risk Assessment

(Review legal frameworks, land tenure, and institutional responsibilities)

A Feasibility Study is a systematic assessment conducted to evaluate the technical, economic, environmental, legal, and social viability of a proposed project. It determines whether a project is achievable and sustainable within given constraints and identifies potential risks and alternatives. The study provides decision-makers with evidence-based recommendations on whether to proceed, modify, or abandon a project before committing significant resources.

Projects

Conducting Feasibility and Initial Environmental Examination (IEE) Study of Lungri Khola Hydropower Project (6 MW)

  • Project Location: Rolpa District
  • Total Contract Amount: NPR 18,193,571.00
  • May 2015 - Sep 2019

Detailed Feasibility Study of Malinia Irrigation Project

  • Project Location: Sarlahi, Nepal
  • Total Contract Amount: NPR 298,263.00
  • Mar 2012 - Jun 2012

Detailed Feasibility Study of Navigation along Narayani River from Devghat to Gandak

  • Project Location: Narayani River (Devghat to Gandak)
  • Total Contract Amount: NPR 5,500,000.00
  • Mar 2021 - Aug 2021

Feasibility, Energy saving and Planning of a Hydropower Project

  • Project Location: Dolakha District
  • Total Contract Amount: NPR 1,500,000.00
  • Nov 2017 - Jan 2018

Feasibility Study, Detail Engineering Survey, Soil Investigation and Detailed Design of Naikap Pedestrian Bridge

  • Project Location: Naikap, Kalanki
  • Total Contract Amount: NPR 473,336.00
  • Jan 2024 - Jan 2024

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Baraiche Khola Bridge along Khambagada-Palaite-Babiyachaur Road in Surkhet District.

  • Project Location: Surkhet District
  • Total Contract Amount: NPR 966,150.00
  • Mar 2016 - Jul 2016

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design, Drawing & Estimate of Contract No. BB-159-DSD-071/72-29

  • Project Location: Tanahun and Nawalparasi Districts
  • Total Contract Amount: NPR 7,572,880.00
  • Sep 2015 - Jul 2017

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Kare Khola Bridge (Dhuliyabit-Bhedabari Road)

  • Project Location: Surkhet District
  • Total Contract Amount: NPR 968,410.00
  • Mar 2015 - Jul 2015

Feasibility Study, Detailed Survey, Soil Investigation, Detailed Design and Cost Estimate of: - Daijee Balma Arakyaghat Balma River Bridge at Daijee Kanchanpur - Toti Sunbara Nadi Bridge at Jhalaripipaladi Municipality Kanchanpur

  • Project Name: Feasibility Study, Detailed Survey, Soil Investigation, Detailed Design and Cost Estimate of Daijee Balma Arakyaghat Balma River Bridge at Daijee Kanchanpur and Toti Sunbara Nadi Bridge at Jhalaripipaladi Municipality Kanchanpur
  • Project Location: Majuwabesi, Sankhuwasabha and Bhojpur
  • Total Contract Amount: NPR 1,020,046.00
  • Jun 2014 - Oct 2014

Feasibility Study of Cross Border Special Economic Zone (CBSEZ) in the Southern Border of Nepal

  • Project Location: Southern Border, Nepal
  • Total Contract Amount: NPR 5,685,000.00
  • Jul 2019 - Jun 2021

Feasibility Study of SEZ in Chitwan

  • Project Location: Chitwan District
  • Total Contract Amount: NPR 800,000.00
  • Jan 2018 - Apr 2018

Feasibility Study of SEZ in Saptari

  • Project Location: Saptari District
  • Total Contract Amount: NPR 1,357,500.00
  • May 2019 - Jul 2019

Feasibility Study of Technical and Vocational Education Development

  • Project Location: Kanchanpur District
  • Total Contract Amount: NPR 193,800.00
  • Mar 2017 - May 2017

Feasibility Study of Various Regional and Tourism Roads and report Preparation

  • Project Location: Syangja & Gulmi district, Nepal
  • Total Contract Amount: NPR 2,245,000.00
  • Jun 2015 - Oct 2015

Feasibility Study of Various Regional and Tourism Roads and report Preparation

  • Project Location: Ilam and Bhojpur Districts
  • Total Contract Amount: NPR 1,499,400.00
  • Jun 2015 - Oct 2015

Feasibility and Environmental Impact Assessment (EIA) Study of Dudh Koshi-5 Hydropower Project (110MW)

  • Project Location: Solukhumbu District, Nepal
  • Total Contract Amount: NPR 17,401,050.00
  • May 2015 - Jan 2020

Feasibility study of Metro-cities in Lumbini Province

  • Project Location: Rapti Valley, Bijaun (Deukhuri), Dang, Nepal
  • Total Contract Amount: NPR 6,314,440.00
  • Dec 2020 - Jun 2021

Prefeasibility Study of SEZ in Tanahu

  • Project Location: Tanahu District
  • Total Contract Amount: NPR 880,835.00
  • Apr 2018 - Jun 2018

Preparation of Feasibility Study of industrial District

  • Project Location: Shatakhani, Surkhet District
  • Total Contract Amount: NPR 3,286,605.00
  • Mar 2018 - Nov 2018

The Feasibility Study of Land Pooling Project at Purano Bazar ward no. 1 Narayan Municipality Dailekh, Purano Bazar ward no. 1

  • Project Location: Purano Bazar ward no. 1, Narayan Municipality Dailekh, Purano Bazar ward no. 1
  • Total Contract Amount: NPR 684,800.00
  • May 2016 - Nov 2016